Port Alma Wharf

Location:

Gladstone QLD

Country:

Australia

Project Type:

Civil / Infrastructure

Project Scale:

0 – 5,000 m²

A wharf deck at Port Alma, on Queensland’s Capricorn Coast, was treated with AQURON 7000. This was applied for chloride protection and concrete durability.

This treatment, a penetrating colloidal silica hydrogel, is part of the CIVIL-TECT system for concrete civil infrastructure protection. It increases the concrete impermeability by locking up moisture and preventing further moisture ingress. This prevents the entrance of contaminants such as chlorides, and arrests any corrosion in progress.

The treatment of the wharf involved pressure-washing the surface before application, to ensure the treatment had the best access to the concrete porosities in order to penetrate the concrete sufficiently.

 

Have a look at how this treatment works here.

Concrete Products & Solutions used.

These related products and concrete solutions were used to protect the concrete of this project.

Sustainable Concrete Corrosion Protection | AQURON 7000
AQURON 7000
CIVIL-TECT | Concrete Infrastructure Protection System
CIVIL-TECT®

Let us keep you Updated.

Subscribe to our ON.CRETE. updates to receive our latest content, plus news and views from the world of concrete.

Scroll to Top