Accolade Park Wind Turbine

Location:

Weybridge, United Kingdom

Country:

United Kingdom

Project Type:

Civil / Infrastructure | Commercial

Project Scale:

0 – 5,000 m²

Accolade Park Wind Turbine – a UK first

You can read about this remarkable project on Accolade Park’s own website. The MARKHAM team were privileged to be involved.

Wind turbines are exposed to full weather conditions by their very nature. The bases in particular use high-mass concrete, and achieving maximum strength is critical for obvious reasons.

AQURON 300 admixture was chosen for this 14m dia turbine base to reduce drying shrinkage, reduce the heat of hydration and achieve early strength gains. Allowing 650m3 to be poured in one day without surface cracking and enabling installation 28 days ahead of schedule.


More about the MARKHAM admixture range here.

Concrete Products & Solutions used.

These related products and concrete solutions were used to protect the concrete of this project.

AQURON 300 - Concrete Waterproofing Admixture
AQURON 300