Harwood Bridge River Crossing
Location:
Maclean, NSW
Country:
Australia
Project Type:
Civil / Infrastructure | Marine
Project Scale:
0 – 5,000 m²
Perfectly cured concrete at the Harwood Bridge river crossing, using HYDRACURE curing blankets. These blankets make the most of the time that the water sits on the slabs, maximising your 7- or 14-day water-cure to increase concrete durability.
Reduce the risk of trapped air and bubbling, to reduce unevenness or discolouration!