Harwood Bridge River Crossing

Location:

Maclean, NSW

Country:

Australia

Project Type:

Civil / Infrastructure | Marine

Project Scale:

0 – 5,000 m²

Perfectly cured concrete at the Harwood Bridge river crossing, using HYDRACURE curing blankets. These blankets make the most of the time that the water sits on the slabs, maximising your 7- or 14-day water-cure to increase concrete durability.

Reduce the risk of trapped air and bubbling, to reduce unevenness or discolouration!

Concrete Products & Solutions used.

These related products and concrete solutions were used to protect the concrete of this project.

Ultimate Water Curing Blanket | CONQOR HYDRACURE
CONQOR HYDRACURE

Let us keep you Updated.

Subscribe to our ON.CRETE. updates to receive our latest content, plus news and views from the world of concrete.

Scroll to Top