Ness Energy Plant

Location:

Aberdeen, Scotland

Country:

United Kingdom

Project Type:

Civil / Infrastructure

Project Scale:

0 – 5,000 m²

At a number of locations within this structure, the concrete walls were found to have rebar cover lower than the architect’s specification.

Rather than demolish and re-cast these sections of the structure, Careys Civil Engineering selected the application of AQURON 2000 to waterproof the concrete and increase its durability, bringing it up to the standards required in the original specification.

Concrete Products & Solutions used.

These related products and concrete solutions were used to protect the concrete of this project.

AQURON 2000 - Concrete Waterproofing Sealer
AQURON 2000