Rush Wall Wind Turbine Bases
Location:
United Kingdom
Country:
United Kingdom
Project Type:
Civil / Infrastructure
Project Scale:
0 – 5,000 m²
AQURON 300 admixture was specified for this concrete raft & turbine base. This was to reduce drying shrinkage, reduce the heat of hydration and achieve early strength gains.
Allowing 690m≥ to be poured in one day without any surface cracking, and to be installed ahead of schedule.