In 2002, The Warehouse Group built a distribution centre at Port of Brisbane as part of their entrance to the Australian market.
45,000m2 of floorspace under roof, besides the external hardstand.
The area under roof was treated with AQURON 1000. The rest was not.
We went back and had a look after 10 years – check out the difference.