Charlie Parker Development
Location:
Parramatta, NSW
Country:
Australia
Project Type:
Apartments | Basements | Waterproofing
Project Scale:
0 – 5,000 m²
Adding Life to Concrete – How MARKHAM provided a robust waterproofing solution for the basement slab at Charlie Parker, overcoming challenging surface conditions.
The Objective
The project team was tasked with waterproofing the basement raft slab of the Charlie Parker development without relying on a traditional membrane system. The underlying challenge was the rough and uneven surface beneath the slab, which posed a significant risk of damaging any conventional membrane. This required a more innovative and resilient solution to ensure effective waterproofing without compromising the integrity of the slab.
Our Solution
To overcome the challenges presented by the sharp rock surface, we implemented the BASE-TECT system, utilising a combination of CONQOR B50, CONQOR 47B, and AQURON 2000. This advanced solution allowed us to bypass the need for a traditional membrane, directly addressing the issues caused by the existing surface. By applying these specialised products, we not only mitigated potential complications but also streamlined the construction process, delivering a cost-effective and time-efficient solution that provided comprehensive waterproofing in a single application.
Positive Results
The final outcome was a fully waterproofed basement slab, achieved without the use of membranes or additional sealers. Our solution resulted in a durable, dry basement that met the project’s stringent requirements. This approach ensured long-term protection and structural integrity.