35,000m2 of investment at the new OJI warehouse in Christchurch.
MARKHAM was involved supplying and applying the SLAB-TECT® system to the concrete floor, to ensure it looked prime for the client.
This involved spray-application of AQURON 1000, a penetrating treatment to cure, seal, and harden, down to 150mm deep. This is equal to 14-days water cure, and results in permanent anti-dust benefits.
Then it was followed up by Hydracure curing blanket for additional benefits, and given a regular scrub to keep the sheen.
Have a look at the Case Study video!