TE Connectivity

Location:

Christchurch

Country:

New Zealand

Project Type:

Commercial

Project Scale:

0 – 5,000 m²

This brand new, green field development houses TE’s (Tyco Electric) development arm and is a bespoke, state-of-the-art facility.

For curing, sealing and moisture control to reduce flooring program delays, MARKHAM supplied and applied AQURON 2000 for the concrete slabs in the TE Connectivity project.

This treatment, part of the FLOOR-TECT system, provides protection to the flooring adhesives. The system prevents moisture from rising up and damaging floor coverings that are installed before the concrete is completely dry.

 

Concrete Products & Solutions used.

These related products and concrete solutions were used to protect the concrete of this project.

AQURON 2000 - Concrete Waterproofing Sealer
AQURON 2000
FLOOR-TECT | Concrete Floor Covering Protection
FLOOR-TECT®

Let us keep you Updated.

Subscribe to our ON.CRETE. updates to receive our latest content, plus news and views from the world of concrete.

Scroll to Top