CONCRETE CURING & Moisture Mitigation prior to Resilient Floorcoverings

MARKHAM provide a end-to-end Design, Supply & Install with Performance Warranty.

FLOOT-TECT Concrete Floor Covering Protection cover page
FLOOR-TECT® SYSTEM complies to AS1884:2021
This system provides both curing for concrete & controlling "moisture in concrete" under resilient flooring

The FLOOR-TECT® SYSTEM is a two step system of internal moisture control plus a surface primer.  This system combines AQURON 2000 and FLOOREVERDRI primer to provide a fully AS1884:2021 compliant system where required.

After FLOOREVERDRI Primer is a applied, a 3mm layer of FLC is required to provide “absorbency” for Adhesives to cure.

  • FLOOR-TECT® SYSTEM includes Design, Supply, Installation, quality assurance, and performance Warranty.
  • FLOOR-TECT® SYSTEM is project specific & a multi-product system
  • FLOOR-TECT® SYSTEM is not a supply only of products, it is an end-to-end service.

Prior to installing floor coverings.
CONCRETE CURING & MOISTURE CONTROL.

SMALL

 

FLOOT-TECT Concrete Floor Covering Protection cover page

Why use FLOOR-TECT®?

FLOOR-TECT® is a two step system of internal moisture control plus a surface primer, designed to comply with AS 1884:2021.

FLOOR-TECT® complies to AS1884:2021

Reduce your risk

  • Eliminate the risk of delamination caused by moisture migration.
  • Code compliant moisture control system so you have peace of mind and the ability to deliver for your clients.
  • MARKHAM is both the product supplier, and installer of the system.

NOTE: After FLOOREVERDRI Primer is a applied, a 3mm layer of FLC is required to provide “absorbency” for Adhesives to cure.

Prior to installing floor coverings.
CONCRETE CURING & MOISTURE CONTROL.

FLOOR-TECT® complies to AS1884:2021

Performance Based Warranty

 

Years of experience in curing, sealing, moisture control and protecting new concrete has proven there is a better way. No need to rely on time-consuming processes, multi-trade installations, and escalating costs at the wrong end of the project. Rather, completely effective and quality treatments from day one, to ensure an optimum slab, a warranted result, a long-lasting performance and a finish you can trust to install floor coverings on.

MARKHAM floor treatments have been trusted and proven in the field for over 25 years – a track record you can BE SURE of.BE SURE – One company, one warranty, one installer for curing, sealing and moisture barrier.

  • Cost effective. Ensuring the right process from day one results in huge decreases in program time and back end costs.

NOTE: After FLOOREVERDRI Primer is a applied, a 3mm layer of FLC is required to provide “absorbency” for Adhesives to cure.

Prior to installing floor coverings.
CONCRETE CURING & MOISTURE CONTROL.

 

FLOOR-TECT® complies to AS1884:2021

Long term durability

  • Both the concrete surface and internal matrix are protected to extend service life.
  • Flexible options. Suits all slab designs and all adhesives and subsequent flooring systems that are formulated for the use on concrete.
  • Compatibility guaranteed.

NOTE: After FLOOREVERDRI Primer is a applied, a 3mm layer of FLC is required to provide “absorbency” for Adhesives to cure.

Prior to installing floor coverings.
CONCRETE CURING & MOISTURE CONTROL.

FLOOR-TECT® complies to AS1884:2021 process.

FLOOR-TECT® is a systematic approach to concrete slab curing and moisture control.

Combining the benefits of MARKHAM’s colloidal silica hydrogel treatments with advanced knowledge of concrete and construction, this is a holistic approach to curing your slab, sealing your slab and enhancing your slab, compiled into a single readily specifiable package.

 

Why not view our on-demand webinar: "Hygiene and Anti-Contamination in Concrete Floor Slabs".

FLOOR-TECT® complies to AS1884:2021

CONCRETE FLOOR SLABS dry very slowly!

CONCRETE FLOOR SLABS dry very slowly!
As international “rule of thumb” concrete dries at the rate of 25mm per month.

This is not only from the time of pour, but from the time the concrete was last wet!
e.g. if it has been exposed to rainy weather during construction.

This means the concrete may still have a high moisture content at the time of installing floor coverings. This in turn can lead to delamination, bubbling, or failure of the adhesive.

MARKHAM’s solution for this challenge is to block the porosity of the concrete, immobilising the moisture. It is important to understand that the moisture is not removed, but it cannot move about and cause issues under the flooring.

Prior to installing floor coverings.
CONCRETE CURING & MOISTURE CONTROL.

 

 

FLOOR-TECT® complies to AS1884:2021

RELATIVE HUMIDITY in CONTROLLED inside concrete. NOT removed

MARKHAM catalytic silica hydrogel treatments control moisture inside the concrete porosity. They do not remove moisture. Therefore, the treated
concrete will have a measurable Relative Humidity (RH), regardless of the type of moisture test used.

Hydrogel moisture control is guaranteed regardless of measurable % RH in the concrete providing the MARKHAM FLOORING INSTALLATION GUIDE “5
Rules & 8 Precautions” are followed.

Prior to installing floor coverings.
CONCRETE CURING & MOISTURE CONTROL.

FLOOR-TECT® complies to AS1884:2021

FLOOR-TECT is a two step system - AQURON 2000 plus a surface primer

AQURON 2000 & MARKHAM FLOORING PERFORMANCE WARRANTY Conditions

FLOOR-TECT®  concrete floor covering protection is the MARKHAM designed and installed system for commercial concrete slabs that will have resilient and direct stick floor coverings installed. Focused on achieving maximum service life and minimal programme disruption.

FLOOR-TECT® is a 2-step systematic approach to concrete slab curing and moisture control. Combining the benefits of MARKHAM’s colloidal silica hydrogel treatments with advanced knowledge of concrete and construction, this is a holistic approach to curing your slab, sealing your slab and enhancing your slab, compiled into a single readily specifiable package.

  • E96 Certified to ensure compliance with flooring standard AS 1884:2021, when primer is used in conjunction with penetrating moisture barrier.
  • Trusted and proven in the field for over 25 years.
  • Supplied, installed and warranted by one provider.

Hydrogel moisture control is guaranteed regardless of measurable % RH in the concrete providing the MARKHAM FLOORING INSTALLATION GUIDE “5
Rules & 8 Precautions” are followed.

Prior to installing floor coverings.
CONCRETE CURING & MOISTURE CONTROL.

Mirnyan Primary School - Multiple Concrete Protections
Cardinia Community Aged Care - Protection for the Concrete
Clyde Creek Primary School - Moisture Control, both New and Retro-applied
Eskdale School, Napier - Rebuilding After Disaster!
Laa Yulta Primary School - Effective Protection for Concrete and Flooring
Sunset Views Manor Aged Care, Tarneit
St Kilda's Childcare
The Piano
TE Connectivity
St Francis School
Treating the floor slabs at the Blues Headquarters - Auckland
The Ponds Aged Care Facility
MINI Car Showroom

Previous FLOOR-TECT® complies to AS1884:2021 projects.

Designed for commercial concrete slabs that will have resilient and direct stick floor coverings installed

Mirnyan Primary School - Multiple Concrete Protections
Cardinia Community Aged Care - Protection for the Concrete
Clyde Creek Primary School - Moisture Control, both New and Retro-applied

More concrete projects.

Laa Yulta Primary School - Effective Protection for Concrete and Flooring
Sunset Views Manor Aged Care, Tarneit
St Kilda's Childcare
The Piano
TE Connectivity
St Francis School
Treating the floor slabs at the Blues Headquarters - Auckland
The Ponds Aged Care Facility
MINI Car Showroom

FLOOR-TECT® complies to AS1884:2021 Details.

END-TO-END SERVICE

FLOOR-TECT® includes Design, Supply, Installation, QA & Performance Warranty. This was previously our Supply & apply service. FLOOR-TECT is NOT supply only of product.

Prior to installing floor coverings.
CONCRETE CURING & MOISTURE CONTROL.

 

NEED HELP WITH SPECIFICATION?

Get the right TECT spec for your project – talk to our design team today.

NEED HELP WITH SPECIFICATION?

Get the right TECT spec for your project – talk to our design team today.

Do you have a project to quote?

Or need some help specifying our products? Let us know the details of your next project and we’ll get in touch.

Scroll to Top