Mirnyan Primary School – Multiple Concrete Protections

Location:

Victoria

Country:

Australia

Project Type:

Education

Project Scale:

5,001 – 10,000 m²

Mirnyan Primary School – Background

Known for convenience during construction as Thompson West Primary School, the Mirnyan Primary School was constructed in 2023-24 as part of the Victorian School Building Authority ongoing program for new school facilities in growth areas.

Multiple Concrete Protections

MARKHAM’s involvement in the construction project was two-pronged.

We applied penetrating hygiene and moisture control treatments to the concrete slabs under floor coverings. This provides protection against the ingress of urine and other bio-fluids.

This treatment is an option to our FLOOR-TECT® system.

Protection of Exposed Concrete

A related hydrogel treatment was applied to external exposed concrete for protection against weathering and premature deterioration.

INFRA-TECT® is a versatile and effective approach for exposed concrete where a sheen is not desirable; for example, car parks and footpaths.

A total of over 5,000 m2 of concrete was treated through the project.

Faced with a similar project? Our friendly team would be happy to discuss how your concrete can be made better for long-term satisfaction!

Concrete Products & Solutions used.

These related products and concrete solutions were used to protect the concrete of this project.

product-card-aquron-2000-flooring-3@2x
AQURON 2000 | Prior to Floor Coverings
product-card-floor-tect@2x
FLOOR-TECT® - OPTIONS for Moisture Mitigation prior to Floor Covering
product-card-infra-tect@2x
INFRA-TECT® - OPTIONS for Precast, Broomed & Insitu Concrete

Let us keep you Updated.

Subscribe to MAKING CONCRETE BETTER email updates to receive our latest content, plus news and views from the world of concrete.

Scroll to Top