Mirnyan Primary School – Multiple Concrete Protections

Location:

Victoria

Country:

Australia

Project Type:

Education

Project Scale:

5,001 – 10,000 m²

Mirnyan Primary School – Background

Known for convenience during construction as Thompson West Primary School, the Mirnyan Primary School was constructed in 2023-24 as part of the Victorian School Building Authority ongoing program for new school facilities in growth areas.

Multiple Concrete Protections

MARKHAM’s involvement in the construction project was two-pronged.

We applied penetrating hygiene and moisture control treatments to the concrete slabs under floor coverings. This provides protection against the ingress of urine and other bio-fluids.

This treatment is an option to our FLOOR-TECT® system.

Protection of Exposed Concrete

A related hydrogel treatment was applied to external exposed concrete for protection against weathering and premature deterioration.

INFRA-TECT® is a versatile and effective approach for exposed concrete where a sheen is not desirable; for example, car parks and footpaths.

A total of over 5,000 m2 of concrete was treated through the project.

Faced with a similar project? Our friendly team would be happy to discuss how your concrete can be made better for long-term satisfaction!

Concrete Products & Solutions used.

These related products and concrete solutions were used to protect the concrete of this project.

product-card-aquron-2000-flooring@2x
AQURON 2000 Prior to Floorcoverings
product-card-floor-tect@2x
FLOOR-TECT ® OPTIONS for Moisture Mitigation prior to Floorcovering
product-card-infra-tect@2x
INFRA-TECT® OPTIONS for Precast, Broomed & Insitu Concrete

Let us keep you Updated.

Subscribe to our ON.CRETE. updates to receive our latest content, plus news and views from the world of concrete.

Scroll to Top