Summerset St Johns, Auckland NZ – Something for all the concrete

Location:

Auckland

Country:

New Zealand

Project Type:

Aged Care & Hospitals

Project Scale:

10,000 m² +

Background to the Summerset St Johns Project

St Johns is one of the most recent projects from the Summerset aged care group. Constructed in 2023-24, the complex opened the first of its buildings in early 2025.

A Variety of Concrete Needs

The MARKHAM team has been extensively involved in the project across its various buildings.

Our contributions include

  • Structural basement waterproofing,
  • Moisture control under floor coverings,
  • and General durability treatment for exposed concrete.

For us it has been a remarkable demonstration of the versatility of concrete hydrogel treatments.

TECT Approach

Our end-to-end TECT approach came into play across the various elements of the project.
You can learn more about each of these pillars:
BASE-TECT® – Basement waterproofing
FLOOR-TECT® – Moisture mitigation prior to resilient floor coverings
INFRA-TECT® – Precast, broomed, insitu curing and durability

– – –

Interested in concrete construction issues? Try our on-demand webinar, “Risk Reduction in Concrete Construction“.

Concrete Products & Solutions used.

These related products and concrete solutions were used to protect the concrete of this project.

product-card-base-tect@2x
BASE-TECT® - OPTIONS for Basement Waterproofing
product-card-infra-tect@2x
INFRA-TECT® - OPTIONS for Precast, Broomed & Insitu Concrete
product-card-floor-tect@2x
FLOOR-TECT® - OPTIONS for Moisture Mitigation prior to Floor Covering

Let us keep you Updated.

Subscribe to our ON.CRETE. updates to receive our latest content, plus news and views from the world of concrete.

Scroll to Top