Glencore Murrin Murrin Nickel-Cobalt Processing Plant

Location:

Murrin Murrin, Western Australia

Country:

Australia

Project Type:

Civil / Infrastructure | Mining

Project Scale:

0 – 5,000 m²

The Glencore Murrin Murrin Nickel-Cobalt Processing Plant includes structures that require the highest level of protection against a variety of harsh chemical attacks, including those from cyanide and sulfuric acid.

To ensure maximum protection against these chemical attacks, it is crucial to choose the right concrete mix. AQURON 300, a concrete admixture, has been specifically designed to provide excellent protection against chemical attacks. By including AQURON 300 in the concrete mix, the resulting structure becomes more durable and resistant to wear and tear.

However, it’s not just about choosing the right concrete mix. Proper curing of the concrete is also an essential component in ensuring maximum protection against chemical attacks. We then applied AQURON 7000 as a cure, for added protection against harsh chemical attacks.

When combined with AQURON 300, it creates a unique and effective solution for concrete structures that require maximum protection against chemical attacks.

By using AQURON 300 and AQURON 7000 together, you can have peace of mind knowing that your concrete structure is well-protected against a range of harsh chemical attacks. This means that your structure will remain durable and long-lasting for many years to come.

Concrete Products & Solutions used.

These related products and concrete solutions were used to protect the concrete of this project.

AQURON 300 - Concrete Waterproofing Admixture
AQURON 300
Sustainable Concrete Corrosion Protection | AQURON 7000
AQURON 7000

Let us keep you Updated.

Subscribe to our ON.CRETE. updates to receive our latest content, plus news and views from the world of concrete.

Scroll to Top