Waterproofing protection at Amazon Bognor Multi-Storey Car Park
The more traditional multi-coat deck membrane that this type of deck structure would normally be sealed with presents a number of challenges, being significantly impacted by poor weather conditions and delays waiting for the appropriate level of concrete cure.
MARKHAM were asked to provide an alternative waterproofing system to seal the top deck of this structure. This was particularly important as the Amazon Bognor Multi-Storey Car Park was constructed between November 2023 and March 2024.
Weather conditions during this period were highly unpredictable, increasing the importance of a reliable hydrogel waterproofing system.
What was the solution and what were the results?
You’re invited to download the free case study!
