MARKHAM Case Study – Rosewood Aged Care

Free case study Rosewood Aged Care

There were two sets of challenges involved in the Rosewood Aged Care.

Firstly, waterproofing the basement. The basement was excavated around a heritage-listed building, which had to stay undamaged for the duration of the works. Piles and shotcrete were implemented for the construction, but there was no scope to install a membrane due to space and other limitations.

Second were the requirements for moisture control and permanent hygiene protection for the interior floor slabs of the residential parts of the building. This is a more routine challenge, faced by aged care facilities with concrete floor slabs.

Download this free case study to learn how the MARKHAM team provided solutions!

Want to see more?

Register to access all of our detailed product information in one single location.

Inside you will find product technical data, MSDS, specifications, BIM files and more.

NEED HELP WITH SPECIFICATION?

Get the right TECT spec for your project – talk to our design team today.

NEED HELP WITH SPECIFICATION?

Get the right TECT spec for your project – talk to our design team today.

Scroll to Top