Surfside EC4 Data Centre

Location:

Eastern Creek, NSW

Country:

Australia

Project Type:

Data Centres | Waterproofing

Project Scale:

10,000 m² +

Adding Life to Concrete – How MARKHAM applied hydrogel moisture control treatments to concrete slabs at a critical data centre facility in Eastern Creek, NSW.

CHALLENGE

The construction of data centres is accelerating sharply, driven by the surging demand for cloud services, artificial intelligence workloads and the ever‑expanding digital infrastructure that underpins modern life.

What does this mean? Speed‑to‑commissioning is everything. On major data centre projects, excess moisture within concrete slabs can become a critical constraint, delaying the installation of waterproofing membranes, coatings or flooring systems and creating programme risk during key construction phases.

At the Surfside EC4 data centre at Eastern Creek, NSW, the construction programme required a moisture control solution that would address these risks without introducing additional curing periods, recoating requirements or surface‑applied barriers that could slow progress.

SOLUTION

For the Surfside EC4 data centre at Eastern Creek, NSW, MARKHAM provided a hydrogel‑based moisture control treatment applied directly to the concrete slabs.

Instead of relying on topical coatings or surface‑applied moisture barriers, this approach addressed moisture within the concrete matrix itself. This removed the need for alternative methods that can introduce additional curing periods, surface preparation requirements or recoating stages.

The treatment could be applied while the concrete was still curing, allowing subsequent construction activities to proceed without unnecessary delay. By avoiding reliance on conventional topical systems, MARKHAM helped remove a potential programme constraint during a critical stage of the build.

RESULT

Construction scheduling for this critical phase of the Surfside EC4 project was optimised by addressing slab moisture directly within the concrete. This reduced the risk of delays commonly associated with moisture‑related assumptions during waterproofing and finishing stages.

Where construction programmes are constrained by slab moisture levels, MARKHAM’s moisture control approach can remove that hindrance, enabling waterproofing membranes, flooring systems or coatings to be installed earlier than would otherwise be possible.

 


Download the Surfside EC4 data centre case study in PDF format.
This and more case studies are also available for download in our library.

 


Project Details – Surfside EC4 Data Centre

Description

Slab moisture control under waterproofing membrane.

Area Treated

34,400m2.

Age of Structure

New, under construction (2021).

Requirements

  • Moisture control to prevent delamination
  • Zero maintenance
  • Environmentally friendly

Operation Downtime /

Interruptions

MARKHAM hydrogel treatments can be applied while the concrete is curing. This greatly speeds the construction scheduling. Next steps can be taken on the slab in 72 hours. There is no need to re-coat.

Application Method

Medium Pressure Boom and Back-Pack Sprayers

Proposed Further Works

No further works required.

OHS Requirements

  • AQURON is nil VOC.
  • Minimal PPE required.

Data centre projects are delivered under uniquely compressed construction and commissioning programmes. For broader industry context on how these pressures shape modern data centre delivery, see resources from the Uptime Institute.

Concrete Products & Solutions used.

These related products and concrete solutions were used to protect the concrete of this project.

AQURON 2000 - Concrete Waterproofing & Durability
AQURON 2000 | SPRAY-ON

Let us keep you Updated.

Subscribe to MAKING CONCRETE BETTER email updates to receive our latest content, plus news and views from the world of concrete.

Scroll to Top