Adding Life to Concrete – How MARKHAM applied hydrogel waterproofing systems to a new multi-storey car park structure at a Panattoni site in Aylesford, England.

OBJECTIVE

The more traditional multi-coat deck membrane that this type of deck structure would normally be sealed with presents a number of challenges, being significantly impacted by poor weather conditions and delays waiting for the appropriate level of concrete cure. MARKHAM were asked to provide an alternative waterproofing system to seal the top deck of this structure.

SOLUTION

MARKHAM was able to assist with a holistic three-part system. The concrete itself was made waterproof by including AQURON 300 admixture in the mix design and AQURON 2000 spray applied treatment. All electrical and drainage penetrations in the decks, and the edge kerb upstands on the decks were sealed with CONQOR 47B delayed swell waterstop gasket.

RESULTS

The inclusion of AQURON 300 in the concrete at mixing stage and the treatment of the concrete with AQURON 2000 the day after placement meant that the waterproofing process was going on concurrently with the pour schedule. This removed the delays typically encountered with the application of a multi-coat membrane system.

Sealing all penetrations and kerb upstands using CONQOR 47B meant that MARKHAM’S waterproofing solution was contiguous across the whole of the top deck area of this structure.

As the waterproofing solution is included right through the full depth of the concrete, this means that it is in place for the lifespan of the concrete and will not require any reapplication or ongoing maintenance. Both AQURON 300 and AQURON 2000 are fully compatible with any form of line marking / road signage meaning that there was no adverse effect / change required to the marking out process for these two deck levels.

 


Download the Panattoni Aylesford Car Park case study in PDF format.
This and more case studies are also available for download in our library.

 


 

Project Details – Panattoni Aylesford Car Park

Description

A new multi-storey car park structure requiring waterproofing to the top deck level

Area Treated

11,235m2.

Age of Structure

New (2023)

Requirements

  • Waterproofing
  • Concrete Curing
  • Slab Sealing and anti-dust hardening
  • Penetrations sealant
  • Zero maintenance
  • Compatible with line marking

Operation Downtime /

Interruptions

As the AQURON 300 was being included in the concrete mix and the AQURON 2000 was applied the day after concrete placement, the treatment works ran simultaneously with the pour schedule meaning that there was no delay / interruption to the construction schedule. It in fact removed a large potential delay that could have been incurred if a multi-layer membrane had been used instead.

Application Method

Medium Pressure Boom and Back-Pack Sprayers

Proposed Further Works

No further works required.

OHS Requirements

  • AQURON is nil VOC.
  • Minimal PPE required.

Concrete Products & Solutions used.

These related products and concrete solutions were used to protect the concrete of this project.

AQURON 300 - Concrete Waterproofing Admixture
AQURON 300 | ADMIXTURE
AQURON 2000 - Concrete Waterproofing & Durability
AQURON 2000 | SPRAY-ON
CONQOR 47B Gasket - Delayed Expansion Waterstop
CONQOR 47B | WATERSTOP GASKET

Let us keep you Updated.

Subscribe to MAKING CONCRETE BETTER email updates to receive our latest content, plus news and views from the world of concrete.

Scroll to Top