We help data centres achieve faster Speed to Power while eliminating the need for traditional concrete coatings that may contribute to facility fire load.
Most data centre projects lose weeks in the concrete package waiting for slabs to dry, membranes to be installed, and coatings to be applied.
Most data centre projects face programme pressure from:
MARKHAM helps project teams identify opportunities to simplify construction activities while improving long-term concrete performance.


High heat loads and the mechanical stresses of continuous server operation accelerate deterioration in untreated concrete. Long-term carbonation leads to surface breakdown, structural weakening and increased maintenance costs over the life of the facility.
MARKHAM hydrogel treatments permanently react within the concrete to block moisture pathways, prevent carbonation, and enhance density, reducing lifetime maintenance requirements from the time of construction.
MARKHAM holds EPDs (Environmental Product Declarations) for key elements in our project range.
Data centre facilities carry strict fire rating requirements. MARKHAM hydrogel treatments do not add to fire load. CONQOR PROTECT treated concrete has been independently tested and classified A1 / A1FL under BS EN 13501-1: 2018 – the highest possible reaction to fire classification. No flame retardants are present in the product.
Our expert team provides technical backup, ensuring quality assurance and offering warranties for our solutions.
Our solutions are designed to address specific challenges and provide effective solutions.
Our expert team provides technical backup, ensuring quality assurance and offering warranties for our solutions.
Get the right TECT spec for your project – talk to our design team today.
Or need some help specifying our products? Let us know the details of your next project and we’ll get in touch.