MINI Car Showroom

Location:

Newmarket, Auckland

Country:

New Zealand

Project Type:

Commercial | Retail

Project Scale:

5,001 – 10,000 m²

At this Mini Showroom, Auckland, we supplied and applied AQURON 2000 for the showroom and office concrete slabs for moisture control to reduce flooring program delays.

This is a key part of the FLOOR-TECT system, for preventing damage to new floor coverings and increasing the durability of concrete long-term.

Concrete typically takes 1 month to dry, per 25mm of thickness. This means a concrete slab 150mm thick will take 6 months to be safe for flooring installation.

The FLOOR-TECT system reduces this time to 28 days, and is entirely compatible with any flooring adhesive that is compatible with concrete.

Concrete Products & Solutions used.

These related products and concrete solutions were used to protect the concrete of this project.

AQURON 2000 - Concrete Waterproofing Sealer
AQURON 2000 SPRAY-ON
product-card-floor-tect@2x
FLOOR-TECT ® OPTIONS for Moisture Mitigation prior to Floorcovering

Let us keep you Updated.

Subscribe to our ON.CRETE. updates to receive our latest content, plus news and views from the world of concrete.

Scroll to Top